Referências: |
"1. Ferreira, J.C.E., ""Planejamento do Processo Assistido por Computador - CAPP"", Apostila, Universidade Federal de Santa Catarina, Departamento de Engenharia Mecânica, Florianópolis, 1996. 2. Wang, H.P. e Li, J.K., “Computer-Aided Process Planning”, Advances in Industrial Engineering, Vol. 13, Elsevier, 1991. 3. Chang, T.C., Wysk R.A. e Wang, H.P., ""Computer Aided Manufacturing"", Prentice Hall International Series in Industrial and Systems Engineering, W.J. Fabrycky e J.H. Mize (eds.), 2ns Edition, 1998. 4. Halevi, G. e Weill, R.D., ""Principles of Process Planning: A Logical Approach"", Chapman & Hall, 1995 5. Halevi, G., ""Restructuring the Manufacturing Process: Applying the Matrix Method"", St. Lucie Press, 19996. ISO TC184/WG3 N324 -T7, ISO 10303 - Part 224 “Mechanical Product Definition forProcess Planning Using Form Features”, South Carolina, EUA, 19947. Shah, J.J. e Mäntÿla, M., ""Advances in Feature Based Manufacturing"", Elsevier, 1994. 8. 8. Anais do International IFIP Conference on Feature Modeling and Advanced Design-For-The-Life-Cycle Systems, Valenciennes, França, 12-14 de Junho, 2001.9. 9. Integration and Automation of Manufacturing Systems (1996-2001 Hugh Jack): ftp://graco.unb.br/pub/alvares/sim/claymore.engineer.gvsu.edu/%257Ejackh/books/integrated10. Automation, Production System, and Computer Integrated Manufacturing, Mikell Groover, 1987, Prentice Hall ." |